New Home Tour: Master Bathroom

03/14/2013

IMG_1274

IMG_1275 IMG_1278 IMG_1279 IMG_1280

At our last house Jason and I built and tiled a custom 4’x5′ shower with two shower heads for our master bathroom, inspired by the house in Costa Rica we stayed at for my sister and brother-in-law’s wedding. It was huge! Our architect was determined to make sure our new master bathroom was not a downgrade so this one is even bigger. And the best part about it is that we have enough water pressure in this house to use two shower heads at the same time…although the hot water does run out a lot faster. It’s awesome in a private locker room kind of way. I like to joke with Jason that when we’re old we’ll be able to hobble our walkers right in here.

IMG_1281 IMG_1282 IMG_1287

The pretty orchid was a housewarming gift from the couple across the street.

IMG_1289

I love the natural light that pours into this room and especially the shower. I have bad vision without my glasses on and natural light in the shower helps me see. Notice that no electric lights are turned on in any of these pictures. It’s that bright, even on a cloudy day.

IMG_1291

Sources can be found on this post I did about our master bathroom plan. The only change is the towels and bathmat, which we ended up getting from Target.

FYI, our architect is Ryan Thewes.

Related Posts:

New Home Tour: Kitchen

New Home Tour: Living Room

New Home Tour: Dining Room

New Home Tour: Den/Playroom

New Home Tour: Nursery (Alianna’s Room)

Room to Grow: Making a Bedroom for Foster Kids


House Tour: Master Bathroom & Laundry Room

08/22/2011

Master Bathroom

Oh man. So much to say about this room. And most of it has already been said. Once upon a time this room was a bedroom. The people who renovated the house before us quickly turned it into a bathroom with a washer and dryer in it. Basically it looked like a bedroom with hardwood floors, a washer and dryer in the closet nook, small shower, pedestal sink (zero storage) and a toilet in a little room. We re-renovated it into a much nicer and more practical master bathroom with a huge (4’x5′) hand-tiled shower with duel rain showers, tiled floors and a sink vanity made from a vintage piece of furniture. And, we did it ALL ourselves. If you have a few hours to burn, you can read all about our renovation project here.

Laundry Room

One of the best parts of the master bathroom renovation was creation of a separate laundry room. I remember having this floor plan epiphany while I was driving home from work one day. Originally we were just going to put doors in front of the W&D, but as the designated laundry-doer, I really wanted a walk in laundry room. Clearly, it’s not finished yet. Projects of higher priority caused us to stop when it was functional and say “good enough for now.” I have plans, though. Plans involving a craft/sewing table and prettier storage baskets for the shelves. Hopes of tiled floors (using the same tiles as the bathroom that we have in storage.) Dreams of attached drywall, mudded, primed, painted…


Bathroom Renovation Stage 14: FINISHED!

09/01/2010

I just looked up my first post about our bathroom renovation and was shocked that it was almost exactly 1 year ago! Wow! I doesn’t feel like it’s been a year. I guess that’s partly because we had a usable toilet almost the whole time, a usable shower after 5 months (the most labor intensive part of the project) and a usable sink and vanity after 8 months.

Before I go on to show pictures of the finished bathroom, I need to reminisce a little. Here’s a look at where we started:

Remember that this room was originally a bedroom and was turned into a master bathroom and laundry room at last minute and when the house flippers ran out of money. (We’re assuming anyway.) Before layout and our plans for the renovation:

We pretty much stuck to that plan except some of the scale seems to be off here. The shower is 4′ x 5′ as it says but we decided not to do a door or a built in bench. Also, we decided we only wanted one sink on the vanity. (Marriage Advice: Have 1 sink in the bathroom. Learn to take turns!)

OK, HERE ARE THE PICTURES OF THE FINISHED BATHROOM!! (Yes, I’m yelling!)

New door installed between the bathroom and laundry room.

Baseboards on, caulked and painted.

Our hope for this room was that it would be a totally relaxing spa-like space.

See all of my bathroom renovation posts here.


Bathroom Renovation Stage 12

04/21/2010

Bathroom renovation has been slowly coming along the past couple of weeks. Jason hung the new mirror over the vanity.

We hung the “relax” sign made by etsy seller William Dohman. It’s hand cut recycled wood that has been dry brush painted. I custom ordered this because Jason and I both wanted a spa-like retreat and relax seems to be the perfect reminder as I step into the steamy shower and wash away all the stresses of the day.

And the bathroom floors have been tiled! We decided on gray 12″ x 24″ porcelain.

The first 11+ chapters:

Here’s our history:

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7

Bathroom Renovation Stage 8

Concrete Shower Pan Goes Down Smooth

Bathroom Renovation Stage 9

Bathroom Renovation Stage 10

Bathroom Renovation Stage 11


Bathroom Renovation Stage 11

04/06/2010

I believe I owe you a bathroom update! Sorry it’s been a while. Things have been slowly and steadily moving along in our master bathroom renovation.

Let’s see … we have walls painted and outlet and light switch covers on. (We decided on SW Contented.)

We have a light above the vanity.

We have tile backer on the floors.

We have a towel rack on the wall.

We have robes, toilet paper and art hanging on the walls.

We have a second shower head (half) installed. It’s not actually attached to the plumbing yet. But it looks pretty doesn’t it?

Here’s our history:

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7

Bathroom Renovation Stage 8

Concrete Shower Pan Goes Down Smooth

Bathroom Renovation Stage 9

Bathroom Renovation Stage 10


Bathroom Renovation Stage 10

03/08/2010

My husband is amazing! (But you knew that already if you’ve been following my blog.) We’ve both been quite busy lately which is nothing but a blessing when you’re self-employed (Jason) or do freelance in addition to your day job (me). And our weekends have been filled up with fun, work and social obligations lately. Also a blessing.

However, the bathroom renovation had almost come to a complete standstill since we (mostly) finished the shower. We’ve both be itching to get the renovation wrapped up but most of the remaining things I have no idea how to do and/or I’d rather trust Jason to do. This past week he has been working hard to find time through the night or during a gap in his daytime work.

Here are some things that have happened (though not very interesting by photograph):

The shower fan & light was installed in the shower. (More adventures of being wedged into a tiny space in the attic. But we do love our low-slung roof.)


Electricity has been run to the shower light, shower  fan, and the light above the vanity. Check out this sweet 3 switches in 1 thing. (What’s it called again!?) Saved us (Jason) from having to cut out a bigger hole in the wall for a new electrical work box.

Electricity has been run to a light in the laundry room (I still can’t believe I have a laundry ROOM!), an outlet in the laundry room and an outlet by the sink in the bathroom.

Lights installed … almost. The ceiling light that was formerly in the bathroom, which was once a bedroom, is now dangling a foot from the ceiling in the laundry room. So helpful when I’m doing laundry at night! Also, there is a light in the bathroom now, above the vanity, but it’s essentially just a light bulb hanging out of the wall. Better than the floor lamp we’ve been using!



Holes in the ceiling have been patched up. Moving lights around and taking down walls created several big holes in the ceiling. Jason’s been patching and matching the lovely (not) spiky texture.


Ahhh … progress feels good! Next up we’ll be installing the second shower head and setting up the plumbing for when it will be connected to the water lines (later…) and finishing up the drywall. Once that is done and all patched up (all Jason here again) we can prime and paint. THEN tile the floors. (Not decided on or purchased yet.) THEN install the vanity. THEN install a sink. (Not decided on or purchased yet.)

Again, MY HUSBAND IS AMAZING! We haven’t had to hire help for any step of the process so far. He’s quite the electrician! Soon we’ll find out how much of a plumber he is!


Background Reading:

Catch up with our bathroom renovation progress:

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7

Bathroom Renovation Stage 8

Concrete Shower Pan Goes Down Smooth

Bathroom Renovation Stage 9


Bathroom Renovation Stage 9

02/09/2010

The shower is DONE!!

Well, 95% done anyway. We’re eventually going to install a 2nd shower head—a rain shower mounted to the ceiling. But that’s a little further down the priority list. Most importantly, the shower is now functional.

Sunday we went shopping for shower curtains and it was SO much more fun than shopping for thin set and grout and tile sealer.

Since we don’t have the 2nd shower head yet, we have some plastic bags stuffed into the hole where the controls will go. Classy, huh?

Despite the plastic bags and the yet to be painted walls, that first long hot shower on Sunday night was so glorious!

Tomorrow you’re welcome to give your opinion on our paint color choices.

Catch up with our bathroom renovation progress:

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7

Bathroom Renovation Stage 8

Concrete Shower Pan Goes Down Smooth


Concrete Shower Pan Goes Down Smooth

01/26/2010

Last weekend we tackled the most intimidating part of the bathroom renovation (in my mind, at least): pouring the concrete shower base. I’ll just show what we did through pictures. And of course I use “we” very loosely here.

Shower all cleared out and ready to go.

Mixing up the concrete mix and water in our pitiful, rusty old wheel barrel. (See the broken wood handle?) I was going to do this part but it turns out my arms are too weak. Each bag of mix was 60 lbs dry.

I prefer to watch this guy in action anyway. I’m excellent moral support.

First bucket full of concrete gets placed. That float is named the Task Force.

Second bucket down. Creating a slight slope toward the drain was very tedious. And important. Jason and his task force can handle it.

The consistency is like wet sand. Not as liquidy as I had imagined.

Four bags/bucketfuls down. 240 lbs. More of the very meticulous smoothing and creating a slight grade toward the drain.

Some days I am very grateful to be married to a perfectionist. Another half a bag to finish it off and get that slope just right. (4.5 bags of sand mix, 270 lbs, 4’x5′ base at 1-1.5″ thick in case you want details.)

All done. Just needs 24 hours to dry. Phew! The whole process only took 3 hours but was very labor-intensive. I’m so glad it’s done. Thank God it all went smoothly. Now on to finishing the rest of the tiling … another update coming soon. I HOPE!

Keeping up with our progress?

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7

Bathroom Renovation Stage 8


Bathroom Renovation Stage 8

01/21/2010

Tile is officially HALF done! Yay! We’ve been working hard on it and our goal is to finish the shower this month. (Sorry for the pieced together photos. Couldn’t get it all in 1 shot.)

We started putting drywall up to close off the laundry area with some leftover pieces from another project.

We designed built-in shelves into one side of the shower wall. In order to finish them with cement board so we can tile, we had to put drywall up on the laundry room side.

Jason bought the concrete for the shower pan today. Saturday is the day we mix and pour and level and pray. I’ll try to remember to keep my camera handy during the process.

Phew! We’ve come a long way! Need to catch up?

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7


Bathroom Renovation Stage 7

01/06/2010

Our master bathroom makeover has been slow moving, mostly because of the busyness of the holidays. But now we’re back at it full steam with a goal of finishing the shower this month. It’s going to be a challenge since we’re averaging about 4 sq. ft. an hour with these little .75″ unglazed porcelain tiles. One wall is almost done.

We’ve got a good system going now where I pop half the tiles off of each sheet in a random pattern at about the same pace as Jason can stick them up on the wall. If I crop out the unfinished parts and you use your imagination with the grout (we’re thinking gray) this picture gives a pretty good idea of the finished look:

Lost? Here’s the process up to now:

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6