New Home Tour: Den/Playroom

02/28/2013

Depending on the angle of the photo, it looks like a den…

IMG_1309  IMG_1312 IMG_1313

But 98% of the time it’s a playroom. (Technically, it’s a guest room, too, though it hasn’t been used as such yet. Someday it’ll be a bedroom.)

IMG_1311

IMG_1320

The closet is full of books, toys and games.

IMG_1315

IMG_1322

IMG_1324

A few things to note about this room:

The sofa is vintage. We’d like to reupholster it someday but it’s not in bad shape and the pull out mattress is in excellent shape.

The rug is from Urban Outfitters. I purchased it for a staging project right before we moved in. We had it in the living room for a little while but it was way too small in there. It’s perfect in here.

This room is the smallest bedroom in the house but the super high ceilings make if feel big and the high windows and concrete wall make it very unique. I’m hoping a teenager will love it as a bedroom someday.

The play stove is second-hand, hand made but someone. I got it at a yard sale. It was Ali’s adoption day gift.

Ali’s navy table was a Christmas gift from Grandma and Grandpa. The metal folding chair is vintage from an estate sale in my neighborhood. I got it when I was putting together our first room for future foster kids.

The small guitar was a baby shower gift before our first placement. It’s still a bit too complex for Ali but she likes to bang on it, August Rush style. The blue guitar is really special to me. It was the guitar Jason first learned to play guitar on…it deserves it’s own post.

The TV is not attached to anything except power. Eventually we plan to get another Roku box for this room (which we use for Hulu and Netflix) and attach a DVD player. We’ll also need some kind of shelving for that.

The robot decals I won from a giveaway on Design Mom. Ali loves to give them kisses.

Ali’s favorite activities right now are the slide (going down and sending toys down) and sitting at her table to play with stickers

FYI, our architect is Ryan Thewes.

Related Posts:

New Home Tour: Kitchen

New Home Tour: Living Room

New Home Tour: Dining Room

 

Advertisement

Art for Ali’s room

01/07/2013

I don’t feel like I’m ready to do a “real” photo tour of any rooms in our new house until we have art hung. Is that weird? Ali’s room is the closest to finished. I hung a few more pictures the other day. We still need to get a curtain rod… then I’ll take better photos with my camera! Hahaha… for now, this is how it’s looking with phone photos:

IMG_7733

She loves to look at herself in that full length mirror. She got the owl coat hooks as a housewarming gift from Aunt Jessica and the owl backpack for Christmas from Nana. The alphabet poster below is from Petite Collage. I won it from Design Mom years ago.

IMG_7720

Ali loves monkeys and immediately said, “Ooh ooh ooh!” when she saw this French Paper poster that was a gift from my friend Renata. The needlepoint art was an adoption day gift from Nana. The polka dot blanket on her rocker is a gift from Ali’s great-aunt Janice.

IMG_7732

The flower (below) and the A pillow (above) were adoption day gifts from my co-worker Dawne. The hand-painted burlap name banner is a gift from my high school youth group friend Emily. And you can’t really see it, but the quilt that she sleeps with in her crib was a gift from her great-aunt Linda. Wow! That’s a lot of thoughtful gifts!

IMG_7517


New Home Update

11/29/2012

It’s been 2 weeks since my last update so there is a lot to share. Two big things: our wood flooring is all done and our kitchen cabinets and appliances have been installed. This week the electrical is getting finished, the countertops are being installed and the plumbing will be done. All of that makes for a pretty much finished house. I’m a little behind in my picture taking so next week I will probably have pictures of a completely finished house. We’re moving in next Friday. Holla! On to the pics:

Den/playroom

I’m loving this fancy pull out trash and recycling drawer!

There will be doors on the corner cabinet up there, they just didn’t have the right hinge with them.

Those upper cabinets of the pantry will have white doors sometime this week.

That air compressor around the corner is a bit scary…

Blowing kisses at the granite yard

We chose these slabs of kashmir granite

Ali knows this is her room. She runs up the pink wall and slaps her hands on it, babbling incoherently. I think she approves.

Master:

Next kids room:

Ali’s room:

Master bedroom

Cherry cabinets stained a walnut color (I don’t remember the name of the specific finish)

I love the white ice appliances in our house as much as I did in the store.

I’m realizing I haven’t taken many new photos of the laundry room or Jason’s studio – those were the last rooms to have the flooring finished. I also haven’t photographed the bathrooms lately. We did have one little snafu with the tile in the master bathroom. We didn’t order enough the first time around so we had to get some more. The tile company sent the wrong color and the tile guy installed it anyway. (What the ?!) So that needs to be scraped up and the tile company promises the new tile will arrive by the end of this week. So, no big deal but a small set back nonetheless. It may or may not be fixed by moving day, but it will be fixed soon.


New Home Update

11/15/2012

Well things didn’t go quite as quickly as we had planned this week. The hold up has been getting the electric connected by the electric company, passing the city inspection and then getting the gas company to come out and set up the meter which involves a lot of people coming out and is completely out of our control. We didn’t have any problems, it just took longer than we were hoping and as I’m writing this on Wednesday night, we still don’t have gas (should be hooked up tomorrow) which means we don’t have heat, which means they can’t put the wood flooring in yet, which means the kitchen won’t go in until next week… which means… we probably won’t be moving in Thanksgiving week after all. The house should essentially be done, but there is a series of inspections the city has to do before we can get an occupancy permit and with it being a holiday week, it’s unlikely they will all happen before Thanksgiving. We can’t move in without an occupancy permit. The good news is that we were originally hoping we’d be in by Christmas and getting in by Thanksgiving was just a nice surprise. We don’t have any rush except excitement. Thank God we have a place to stay at my parents’ house for as long as we need.

So, what did happen this week? The HVAC was installed along with the hot water heater. We got power! At the point of me writing this, about half of our lights are installed. Door handles were installed. Jason and I took the master key on Tuesday night and had new specialty keys made for ourselves. We also picked up some LED lights to put up on our light shelf, but we need to get more. We guessed on the 100 lights/33 ft. set.

I had to run out to the hardware store to grab a couple of lights for closets that we had forgotten about. Jason was out of town and happened to have horrible reception while I was at the store so I couldn’t even consult with him. This was the picture I sent him to say, “I got these. OK?”

Outlets and some fixtures are in.

We were going to get fans for every bedroom but we decided to save money and get some cheapos for now and we’ll replace them one at a time later on.

We still got a nice fan for our bedroom and we’ll have one in the living room as well.

This is a silent “door bell” in Jason’s studio. Remind me to tell you about that later.

The HVAC looks like it was custom painted to match our house. It was not but that would be cool, wouldn’t it?

We like dimmers. We’re going to have a lot of dimmers.

It was foggy one morning while I was walking Lucy and I took this pretty autumny photo.

Lights! Jason, who is a perfectionist (I love that about him!) is straightening one of many crocked door handles.

We got these squarish door levers and it’s really noticeable if they’re a little bit off.

Jason is checking out the hall bathroom.

This is the first time we’ve really been able to see the tile and paint color because this is the only windowless room in the house and it has always been dark until now. That’s precisely why I wanted a light airy color on the walls (SW window pane) and I’m really happy with how it goes with the light gray tile and white tub (we’ll also have a white toilet, white vanity, white sink/countertop.)

Only 1 of 4 lights was installed so it’ll get a lot brighter in here.

We turned on all of the lights that we could and ran back outside in the cold to see what it looks like lit up. We have lights in the eaves around the house so once they’re installed it’ll really light up at night.

We have 2 workable outside lights on either side of the garage.

A custom house justifies custom keys right?

Kitchen:

Living room:

From mudroom/office (green room) pocket door looking toward the living room, kitchen and dining room:

Next update I should have pictures of finished tile work, finished hardwood floors, finished lighting, finished kitchen … hopefully a finished house!!


New Home: Den/Playroom Plan

11/13/2012

Den/Playroom Room plan from myMCMlife.com

Sources

1. Sherwin Williams Greek Villa

2. Exposed concrete block wall

3. IKEA TROMSO day bed and pull out trundle $80 each (This is a big fat maybe. I was hoping our vintage gold pull out sofa would fit in here but it’s too big. We need some comfy seating that would ideally work also as a guest bed or maybe even a bed for a future child. No futons.)

4. Basketball hoop. $33 on Amazon. The top priority of this room is fun.

5. Natural hickory wood floors, like the rest of the house

6. Black chalkboard wall

7. Jason’s first guitar, which is now wall art. Second priority of this space is creativity and musical instruments will definitely be part of that.

8. Urban Outfitters zig zag rug, 5×7, in gray. Another big maybe but it’s my current top choice.

9. Pop & Lolli Build-a-Bot decal set. I won these on Design Mom’s blog and I’m pretty stoked to play with them… I mean, let some kids play with them.

10. Some kind of bookshelf to store toys, books, instruments. Vintage and metal painted a bright color would be nice. (This one is from UO.)

11. My old Apple iBook from 2002, which is still kicking, sort of, and hopefully has enough juice left to play some kid’s DVDs. Eventually we might add a small LED TV into this room.

12. Vintage footstool

13. Metal storage cart (painted a funky color) for toys and things

14. Child-size seating, like this metal folding chair, and maybe eventually a child-size table.


New Home Update

11/08/2012

Last week the concrete was poured for our back patio and our driveway. The painters finished their work inside and outside. And the house had major clean-up done inside and outside as well. All of that was finished in time to get the house ready for a modern architecture home tour that took place on Saturday. Our house was 1 of 5 on the self-guided tour. The tour was good promotion for our architect and our builder but it was also fun for me to hear people’s feedback, questions and encouragement. I put Ali in play clothes and she finally had a chance to really explore the house, the driveway and the yard. (Usually there are too many hazards everywhere to let her just go and be a curious toddler.) I also had a chance to chat with some of our neighbors. I’m really thankful we get to stay in the neighborhood that we’ve loved for the past 6 years. We’ve got great people living all around us. I also had a ton of time to talk with one of the guys from our construction company and I’m again so grateful that we found them—such good, honest, hard-working people. Integrity is somewhat rare in the contracting business. On to the pictures (mostly taken before the inside was cleaned.)

The concrete guy was really sweet and offered to help us put Ali’s handprint in the patio. She kept trying to grab a handful of the concrete so it didn’t come out great, but he did his best to clean it up and he carved her initials and the date before it was dry. My parents built a house when I was a baby and all 5 of us had our handprints in the back patio. I always loved to put my hand in the prints to see how small my hand used to be, how close it was to growing into my big brother’s print and how small my hand was (and still is) compared to my dad’s.

Front door, entry, dining room (looking through the kitchen):

Kitchen and dining room:

Pocket door!

Living room:

The natural light in the great room is ahhhhmazing! (Credit for excellent design goes to our architect, Ryan Thewes.)

Kitchen:

The den/playroom:

Ali’s room:

Future kids room:

Front door (second door is a coat closet)

Again with the amazing natural light! We’re hardly ever going to need to turn the lights on during the day here.

My office and the laundry room. It’s green.

Jason’s studio. It’s not very photogenic yet.

Garage lights:

Electric meter is ready to go. Yeah, we don’t have underground electricity here. We have ugly wires that go from one corner of the house to a pole across the street. It ain’t pretty.

I got a new doormat at Target special for the tour. And now it’s filthy…but at least it was welcoming!

I love getting to watch Ali transform from a baby into a kid.

Walking all around like she owns the place! Oh wait, she does.

Next up HVAC, Electricity, Gas? Tile?

Next week we should have wood flooring, tile work, plumbing, kitchen cabinets. We’ll be living here in 2 weeks. Ack!


New Home Update

11/01/2012

This week was not quite as exciting as the one before. Jason and I gave our brick mailbox a makeover to match our new house. He cut and chopped up a bunch of firewood. (Yay for wood burning fireplace!!) We got our garage door installed. Some siding was repaired by the front door and the roof that cantilevers over the front porch. Our gutters were installed. Jason and I piled up a bunch of leaves, swept out the garage and assembled IKEA bathroom vanities. (No pictures of those last three things.)

While the painters were painting the trim, they also primed this wall black for chalkboard paint.

We stopped by on Saturday morning to find the garage door being installed by a guy from our church and his sons. That was a fun surprise.

The gutters were installed on Tuesday.

These don’t seem as intrusive as I thought they would.

Spontaneous family portrait:

The next step is a bunch of steps that happen all together and involve permits and codes and red tape: electrical finish out, gas finish out, HVAC installation. Soon after the house is climate controlled, we can have the wood floors installed. Any time in the next week or two the painters and the tile guys can finish their work. Plumbers will be back to hook up toilets and sinks and finish out the fixtures. The very last big project will be the kitchen installation and it’s scheduled for November 14th. Less than 2 weeks away! We’re anticipating moving in right before Thanksgiving.

I feel the urge to start packing!


New Home: Master Bathroom Plan

10/29/2012

Master Bathroom Inspiration Board and Design Plan from myMCMlife.com

Sources

1. Sherwin Williams Window Pane – (I lovelovelove this color)

2. IKEA MINUT pendant 13″ globe light $40

3. Kendal Lighting VF3400-1L-SN Satin Nickel 1 Light White Shade Madison Bathroom Vanity Light (Item #: 411819 |  Model #: VF3400-1L-SN) from Lowes – 2 of these on either side of mirror

4. IKEA LILLAGEN mirror medicine cabinet $70

5. Delta Vero single-hole, high arch faucet

6. IKEA GODMORGON/ODENSVIK bathroom vanity, white stained oak $489

7. Daltile 1×1 mosaic in “marble” tile for the shower surround and the floor

8. KOHLER toilet with soft-close lid

9. IKEA RAMSKÄR bath mat $17

10. IKEA AFJARDEN bath sheets $15 each

11. IKEA GRUNDTAL toilet paper holder $6, hand towel bar $10 and bath towel rack $15

12. Custom carved wood “Relax” sign from William Dohman

13. Eat More Fiber poster designed by me (this may or may not make it back into the master bathroom!)

14. Delta Vero T14243 rain shower head and diverter – 2 of these for our big shower

Those without prices are items that our contractor already has or will purchase and he can get better than retail prices.


New Home Update

10/25/2012

Confession: I wrote Monday’s post with my Photoshop mock-ups of the painted house on Friday night. Shocker: The painters came on Saturday and Sunday and finished all the exterior painting over the weekend! Did I tell you things were flying around here? Let’s see, I have a few progress shots of the painting that I took to send to Jason because he was in Norway over the weekend. And by Sunday afternoon I was snapping the finished painted house pictures.

We’re extremely happy with our color choices, in case you’re wondering.

You can see the Drizzle living room wall through the windows beside the fireplace. It’s quite a similar color to the outside Restful.

My desk will be right under that window. Hi, new home office! It’s also the laundry room and (FUN FACT) it’s the only room in the house with a flat ceiling.

The tile in the hall bathroom has been laid. We like. Good find, contractors! Our GC and his son found this for us based on a description of what we wanted. I think they found it at Lumber Liquidators (?) for somewhere in the neighborhood of $1.50 per sq. ft. Score!

We had a shower wall enclosure built in our master bathroom and the concrete shower pan has been set. That shower will be all tiled like our last house’s master bathroom and we’ll have the same tile on the shower walls, floor and the bathroom floor.

Shampoo and soap nichés! Nitches. Nissssshes. Neeeeshays. We’ve been having fun with that word.

We had two hiccups with our Daltile selection. First, the mosaic blend we chose for the master called Keystone Mosaics in Beach is apparently discontinued. Frustrating but whatever. We picked another tile off of the same sample boards, a speckled beige called Marble. (Top row arrow in photo below.)

Two days later, our contracter when to the Daltile store to order our selections and found out that our hall bathroom tub surround choice, Aegean, will take 4-6 weeks to order. Seriously?! What’s the deal with the sales people at this store? They could have told us when we were in there the first time that the Beach pattern we selected was discontinued and it would have been really nice to know that some of the tiles they can get in stock in days and others take MONTHS. Ugh! Anyway… thankfully this time I had photos of the tile sample boards and we were able to find another one we like that they can get in stock in a few days: Waterfall. (4th row arrow in the photo above.) All of these decisions happen in a matter of minutes. Contractor calls Jason from tile store. Jason calls me at work. I email Jason pictures of the tile sample boards and my top 4 replacement choices. He calls the contractor and asks which of those choices they can get in stock quickly. Decision made. BAM.

Sidenote: I guess we’re on a turquoise kick!

We’ve also had trim and baseboards installed. They’re mostly done now.

Our site supervisor built steps to go into the house from the garage. Not too exciting. The vertical railings next to the stairs, as well as a handle, were added after I took this picture.

He also finally got rid of that ugly angled board that was giving extra support to the cantilevered overhang above the front door. The framers put it up there because they were concerned it was sagging and it looked awful. Now there is a big steel I-beam instead and it’ll be covered over with Hardie board on the porch side.

First stop on the way home from the airport when Jason returned from Norway: the new house, of course!

I-beam extending into the garage.

Our interior doors were all stained and sealed in natural wood tone and you can see in the background that the kitchen wall that was supposed to be white (Greek Villa) is now white again.

The black wall in Ali’s room was primed again in white. However, the wall that is supposed to be chalkboard black in the den is still white. We’ll see what happens when the painters come back to finish painting today and tomorrow. Say a prayer!

See all those leaves in the backyard? Our back patio is supposed to be poured right there but our contractor doesn’t want our concrete covered with leaf impressions so we might wait a little longer.

Next up? I don’t know… Wood flooring, I hope!


New Home: Guest Bathroom Plan

10/23/2012

I worked on this inspiration board guest bathroom (AKA hall bathroom, kids bathroom, etc.) and I’m glad I did because I kept remembering more details to add to the plan. Beyond the already decided upon tile, vanity, mirror, lighting and paint color, I realized I also need to plan rugs, towels, shower curtain, towel and toilet paper hanging hardware. I didn’t even get to the point of art or sink top accessories. Here’s what I have come up with so far:

Guest Bathroom Inspiration Board and Design Plan from myMCMlife.com

Sources

1. Sherwin Williams Window Pane – (I lovelovelove this color)

2. IKEA MINUT pendant 13″ globe light $40

3. Kendal Lighting VF3400-1L-SN Satin Nickel 1 Light White Shade Madison Bathroom Vanity Light (Item #: 411819 |  Model #: VF3400-1L-SN) from Lowes – 2 of these on either side of mirror

4. IKEA LILLAGEN mirror medicine cabinet $70

5. Delta Vero single-hole, high arch faucet

6. IKEA GODMORGON/ODENSVIK bathroom vanity $489

7. Light gray slate-like 12×24 tile

8. KOHLER toilet with soft-close lid

9. IKEA GRUNDTAL toilet paper holder $6, hand towel bar $10 and bath towel rack $15

10. IKEA FRÄJEN bath sheets $10 each

11. Curved Shower Curtain Rod (maybe this one, pictured, for $40)

12. Daltile 1×1 matte “aegean” porcelain tiles for tub surround

13. IKEA TALLHOLM shower curtain $15

14. White bathtub (it’s already installed and honestly, I don’t remember which one it is)

15. IKEA TOFTBO bath mat in turquoise $13

16. Delta Vero 14453 shower head, diverter and tub faucet

Those without prices are items that our contractor already has or will purchase and he can get better than retail prices.