Update on the MCM Post-Flood Rebuild

02/08/2011

At the beginning of the year, our friends’ house was torn down. (Remember, it had been destroyed in the May 2010 Nashville Flood after having standing water 4 ft. above the foundation level.) The new house must be built up off the ground and follow all sorts of ridiculous FEMA regulations. Construction started last week:

The house basically has an above-ground unfinished basement. They’re not allowed to use this space for any habitable living space. Half of it is graveled and the other half is paved for a garage and storage area. And possibly a roller rink?

If I can get their permission to do so, I’ll keep you posted with the design and interior development. If not, I’ll just kept tabs on the exterior changes.

(CBB 3.0)