Advertisements
 

Bathroom Renovation Stage 13

It’s been a while since I’ve updated about our master bathroom renovation. That’s because we stopped working on it for a while. But, I do have some good news to report – the sink and vanity are installed!

Jason and I tiled the top of the vanity and then he put in the sink and faucet and did all the plumbing.

The bathroom is almost completely done. Just a few finishing touches that we’ll get around to eventually … baseboards, a door to the laundry room, caulking around the vanity. But it’s mostly done and fully functional. Yay!

In case you’re bored:

Bathroom Renovation Stage 1

Bathroom Renovation Stage 2

Bathroom Renovation Stage 3

Bathroom Renovation Stage 4

Bathroom Renovation: Tiling!

Bathroom Renovation Stage 5

Bathroom Renovation Stage 6

Bathroom Renovation Stage 7

Bathroom Renovation Stage 8

Concrete Shower Pan Goes Down Smooth

Bathroom Renovation Stage 9

Bathroom Renovation Stage 10

Bathroom Renovation Stage 11

Bathroom Renovation Stage 12

Advertisements

One Response to Bathroom Renovation Stage 13

  1. […] 09/01/2010 in Art, Art: bathroom renovation, Art: interior design | Tags: home, master bathroom, bathroom renovation I just looked up my first post about our bathroom renovation and was shocked that it was almost exactly 1 year ago! Wow! I doesn’t feel like it’s been a year. I guess that’s partly because we had a usable toilet almost the whole time, a usable shower after 5 months (the most labor intensive part of the project) and a usable sink and vanity after 8 months. […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: